Radab, manufacturer of electric actuators

Telemetry systems

project subject :

Design of control and telemetry system of Ardabil water supply facility

 

Geographical location of the project:

Ardabil – Ardabil

 

main contractor:

Rahsara Co

 

Implementation activities of the plan:

 

– Installation and commissioning of 45 radio telemetry systems of Ardabil water supply facilities

– Installation and operation of 45 flowmeters

– Installation and operation of 65 electric actuators

– Installation of precision instruments for pump houses, reservoirs and water wells and 40 measurement stations of the city’s water distribution network.

– Installation and operation of 45 PLC control systems for pump houses and water tanks and wells

– Installation and commissioning of UPS required for pump houses and water tanks and wells and forty measuring stations of the city’s water distribution network

– Installation and operation of control and monitoring equipment of the central control room and monitoring equipment of the water and sewage company

– 20 chlorine measurement points in the city

– 12 chlorine measurement points in tanks and stations

– 20 Dubai measurement points in the city

– 67 flow measurement points in the entire network

– 35 network pressure measurement points

– 10 drinking water turbidity measuring points

 

project schedule:

 

Years of project implementation: 1390-1394