project subject :
Design of control and telemetry system of Ardabil water supply facility
Geographical location of the project:
Ardabil – Ardabil
main contractor:
Rahsara Co
Implementation activities of the plan:
– Installation and commissioning of 45 radio telemetry systems of Ardabil water supply facilities
– Installation and operation of 45 flowmeters
– Installation and operation of 65 electric actuators
– Installation of precision instruments for pump houses, reservoirs and water wells and 40 measurement stations of the city’s water distribution network.
– Installation and operation of 45 PLC control systems for pump houses and water tanks and wells
– Installation and commissioning of UPS required for pump houses and water tanks and wells and forty measuring stations of the city’s water distribution network
– Installation and operation of control and monitoring equipment of the central control room and monitoring equipment of the water and sewage company
– 20 chlorine measurement points in the city
– 12 chlorine measurement points in tanks and stations
– 20 Dubai measurement points in the city
– 67 flow measurement points in the entire network
– 35 network pressure measurement points
– 10 drinking water turbidity measuring points
project schedule:
Years of project implementation: 1390-1394