Radab, manufacturer of electric actuators

Pump station

Electrical and control equipment and precision instruments of the secondary pumping stations of the first construction unit of Khoda Afarin

Geographical location of the project:

East Azerbaijan and Ardabil

main contractor:

Rahsara Co

  Implementation activities of the plan:

  – Construction and installation of power and control panels for 12 pumping stations

  – Installation and commissioning of 36 electromagnetic flowmeters

  – Installation and commissioning of 103 electric actuators

  – Installation of precision instruments for pump houses

  – Installation and operation of PLC system and control system of 12 chapters of pump houses

  – Installation and operation of 103 local control panels of electric pumps

  – Installation and commissioning of the control and monitoring equipment of the control room of 9 pumping stations

project schedule:

Years of project implementation: 2018-2019

project subject:

Pumping station from the main Moghan canal

Geographical location of the project:

Ardabil – Moghan

main contractor:

Rahsara Co

Implementation activities of the plan:

– Construction and installation of power and control panels for 6 one and a half megawatt pumps

– Installation and operation of 1 ultra sonic flowmeter

– Installation and operation of 8 electric actuators

– Installation of precision instruments in the pump house

– Installation and operation of PLC system and control system – Installation and operation of 6 local control panels of electric pumps

– Installation and commissioning of control and monitoring equipment of the central control room

– Construction, transport and installation of signs and station telemetry system with regulatory tank

project schedule:

Years of project implementation: 2016-2018

 

project subject :

Electrical and control equipment and precision instruments of the secondary pumping stations of the first construction unit of Khoda Afarin

Geographical location of the project:

East Azerbaijan and Ardabil

main contractor:

Rahsara Co

  Implementation activities of the plan:

  – Construction and installation of power and control panels for 12 pumping stations

  – Installation and commissioning of 36 electromagnetic flowmeters

  – Installation and commissioning of 103 electric actuators

  – Installation of precision instruments for pump houses

  – Installation and operation of PLC system and control system of 12 chapters of pump houses

  – Installation and operation of 103 local control panels of electric pumps

  – Installation and commissioning of the control and monitoring equipment of the control room of 9 pumping stations

project schedule:

Years of project implementation: 2018-2019

Arsbaran irrigation and drainage network plan – construction of buildings and purchase, installation and commissioning of electromechanical equipment – first part

 

Geographical location of the project:

East Azerbaijan – Kalibar

 

main contractor:

Rahsara Co

 

  Implementation activities of the plan:

  – Construction and installation of power and control panels for 7 pumping stations for 64 high pressure electropumps

  – Installation and operation of 64 electric pumps of pumping stations

  – Installation and commissioning of 21 electric actuators

  – Installation of precision instrument equipment in 7 parts of the pump house

  – Installation and operation of 14 nailing systems

  – Installation and commissioning of 103 local control panels of electric pumps

  -Installation and operation of 20 kV panels in 7 stations

 

project schedule:

Years of project implementation: 2007-2008


project subject:

Pumping station from the main Moghan canal

Geographical location of the project:

Ardabil – Moghan

main contractor:

Rahsara Co

Implementation activities of the plan:

– Construction and installation of power and control panels for 6 one and a half megawatt pumps

– Installation and operation of 1 ultra sonic flowmeter

– Installation and operation of 8 electric actuators

– Installation of precision instruments in the pump house

– Installation and operation of PLC system and control system – Installation and operation of 6 local control panels of electric pumps

– Installation and commissioning of control and monitoring equipment of the central control room

– Construction, transport and installation of signs and station telemetry system with regulatory tank

project schedule:

Years of project implementation: 2016-2018

 

project subject :

Electrical and control equipment and precision instruments of the secondary pumping stations of the first construction unit of Khoda Afarin

Geographical location of the project:

East Azerbaijan and Ardabil

main contractor:

Rahsara Co

  Implementation activities of the plan:

  – Construction and installation of power and control panels for 12 pumping stations

  – Installation and commissioning of 36 electromagnetic flowmeters

  – Installation and commissioning of 103 electric actuators

  – Installation of precision instruments for pump houses

  – Installation and operation of PLC system and control system of 12 chapters of pump houses

  – Installation and operation of 103 local control panels of electric pumps

  – Installation and commissioning of the control and monitoring equipment of the control room of 9 pumping stations

project schedule:

Years of project implementation: 2018-2019

project subject :

Arsbaran irrigation and drainage network plan – construction of buildings and purchase, installation and commissioning of electromechanical equipment – first part

 

Geographical location of the project:

East Azerbaijan – Kalibar

 

main contractor:

Rahsara Co

 

  Implementation activities of the plan:

  – Construction and installation of power and control panels for 7 pumping stations for 64 high pressure electropumps

  – Installation and operation of 64 electric pumps of pumping stations

  – Installation and commissioning of 21 electric actuators

  – Installation of precision instrument equipment in 7 parts of the pump house

  – Installation and operation of 14 nailing systems

  – Installation and commissioning of 103 local control panels of electric pumps

  -Installation and operation of 20 kV panels in 7 stations

 

project schedule:

Years of project implementation: 2007-2008


project subject:

Pumping station from the main Moghan canal

Geographical location of the project:

Ardabil – Moghan

main contractor:

Rahsara Co

Implementation activities of the plan:

– Construction and installation of power and control panels for 6 one and a half megawatt pumps

– Installation and operation of 1 ultra sonic flowmeter

– Installation and operation of 8 electric actuators

– Installation of precision instruments in the pump house

– Installation and operation of PLC system and control system – Installation and operation of 6 local control panels of electric pumps

– Installation and commissioning of control and monitoring equipment of the central control room

– Construction, transport and installation of signs and station telemetry system with regulatory tank

project schedule:

Years of project implementation: 2016-2018

 

project subject :

Electrical and control equipment and precision instruments of the secondary pumping stations of the first construction unit of Khoda Afarin

Geographical location of the project:

East Azerbaijan and Ardabil

main contractor:

Rahsara Co

  Implementation activities of the plan:

  – Construction and installation of power and control panels for 12 pumping stations

  – Installation and commissioning of 36 electromagnetic flowmeters

  – Installation and commissioning of 103 electric actuators

  – Installation of precision instruments for pump houses

  – Installation and operation of PLC system and control system of 12 chapters of pump houses

  – Installation and operation of 103 local control panels of electric pumps

  – Installation and commissioning of the control and monitoring equipment of the control room of 9 pumping stations

project schedule:

Years of project implementation: 2018-2019

Mechanical and electrical equipment of the pump houses of part of the fourth and fifth construction units – Sattarkhan dam network plan

 

Geographical location of the project:

East Azerbaijan – Ahar

 

main contractor:

Rahsara Co

 

  Implementation activities of the plan:

  – Construction and installation of power panels and capacitor banks and control panels for 6 pump stations

  – Installation and commissioning of 8 electromagnetic and ultrasonic flowmeters

  – Installation and operation of 30 electric actuators

  – Installation of precision instruments for pump houses

  – Installation and operation of PLC system and control system of 12 chapters of pump houses

  – Installation and commissioning of 30 local control panels of electric pumps

 

project schedule:

Years of project implementation: 2007-2008


project subject :

Arsbaran irrigation and drainage network plan – construction of buildings and purchase, installation and commissioning of electromechanical equipment – first part

 

Geographical location of the project:

East Azerbaijan – Kalibar

 

main contractor:

Rahsara Co

 

  Implementation activities of the plan:

  – Construction and installation of power and control panels for 7 pumping stations for 64 high pressure electropumps

  – Installation and operation of 64 electric pumps of pumping stations

  – Installation and commissioning of 21 electric actuators

  – Installation of precision instrument equipment in 7 parts of the pump house

  – Installation and operation of 14 nailing systems

  – Installation and commissioning of 103 local control panels of electric pumps

  -Installation and operation of 20 kV panels in 7 stations

 

project schedule:

Years of project implementation: 2007-2008


project subject:

Pumping station from the main Moghan canal

Geographical location of the project:

Ardabil – Moghan

main contractor:

Rahsara Co

Implementation activities of the plan:

– Construction and installation of power and control panels for 6 one and a half megawatt pumps

– Installation and operation of 1 ultra sonic flowmeter

– Installation and operation of 8 electric actuators

– Installation of precision instruments in the pump house

– Installation and operation of PLC system and control system – Installation and operation of 6 local control panels of electric pumps

– Installation and commissioning of control and monitoring equipment of the central control room

– Construction, transport and installation of signs and station telemetry system with regulatory tank

project schedule:

Years of project implementation: 2016-2018

 

project subject :

Electrical and control equipment and precision instruments of the secondary pumping stations of the first construction unit of Khoda Afarin

Geographical location of the project:

East Azerbaijan and Ardabil

main contractor:

Rahsara Co

  Implementation activities of the plan:

  – Construction and installation of power and control panels for 12 pumping stations

  – Installation and commissioning of 36 electromagnetic flowmeters

  – Installation and commissioning of 103 electric actuators

  – Installation of precision instruments for pump houses

  – Installation and operation of PLC system and control system of 12 chapters of pump houses

  – Installation and operation of 103 local control panels of electric pumps

  – Installation and commissioning of the control and monitoring equipment of the control room of 9 pumping stations

project schedule:

Years of project implementation: 2018-2019

project subject :

Mechanical and electrical equipment of the pump houses of part of the fourth and fifth construction units – Sattarkhan dam network plan

 

Geographical location of the project:

East Azerbaijan – Ahar

 

main contractor:

Rahsara Co

 

  Implementation activities of the plan:

  – Construction and installation of power panels and capacitor banks and control panels for 6 pump stations

  – Installation and commissioning of 8 electromagnetic and ultrasonic flowmeters

  – Installation and operation of 30 electric actuators

  – Installation of precision instruments for pump houses

  – Installation and operation of PLC system and control system of 12 chapters of pump houses

  – Installation and commissioning of 30 local control panels of electric pumps

 

project schedule:

Years of project implementation: 2007-2008


project subject :

Arsbaran irrigation and drainage network plan – construction of buildings and purchase, installation and commissioning of electromechanical equipment – first part

 

Geographical location of the project:

East Azerbaijan – Kalibar

 

main contractor:

Rahsara Co

 

  Implementation activities of the plan:

  – Construction and installation of power and control panels for 7 pumping stations for 64 high pressure electropumps

  – Installation and operation of 64 electric pumps of pumping stations

  – Installation and commissioning of 21 electric actuators

  – Installation of precision instrument equipment in 7 parts of the pump house

  – Installation and operation of 14 nailing systems

  – Installation and commissioning of 103 local control panels of electric pumps

  -Installation and operation of 20 kV panels in 7 stations

 

project schedule:

Years of project implementation: 2007-2008


project subject:

Pumping station from the main Moghan canal

Geographical location of the project:

Ardabil – Moghan

main contractor:

Rahsara Co

Implementation activities of the plan:

– Construction and installation of power and control panels for 6 one and a half megawatt pumps

– Installation and operation of 1 ultra sonic flowmeter

– Installation and operation of 8 electric actuators

– Installation of precision instruments in the pump house

– Installation and operation of PLC system and control system – Installation and operation of 6 local control panels of electric pumps

– Installation and commissioning of control and monitoring equipment of the central control room

– Construction, transport and installation of signs and station telemetry system with regulatory tank

project schedule:

Years of project implementation: 2016-2018

 

project subject :

Electrical and control equipment and precision instruments of the secondary pumping stations of the first construction unit of Khoda Afarin

Geographical location of the project:

East Azerbaijan and Ardabil

main contractor:

Rahsara Co

  Implementation activities of the plan:

  – Construction and installation of power and control panels for 12 pumping stations

  – Installation and commissioning of 36 electromagnetic flowmeters

  – Installation and commissioning of 103 electric actuators

  – Installation of precision instruments for pump houses

  – Installation and operation of PLC system and control system of 12 chapters of pump houses

  – Installation and operation of 103 local control panels of electric pumps

  – Installation and commissioning of the control and monitoring equipment of the control room of 9 pumping stations

project schedule:

Years of project implementation: 2018-2019