project subject :
Mechanical and electrical equipment of the pump houses of part of the fourth and fifth construction units – Sattarkhan dam network plan
Geographical location of the project:
East Azerbaijan – Ahar
main contractor:
Rahsara Co
Implementation activities of the plan:
– Construction and installation of power panels and capacitor banks and control panels for 6 pump stations
– Installation and commissioning of 8 electromagnetic and ultrasonic flowmeters
– Installation and operation of 30 electric actuators
– Installation of precision instruments for pump houses
– Installation and operation of PLC system and control system of 12 chapters of pump houses
– Installation and commissioning of 30 local control panels of electric pumps
project schedule:
Years of project implementation: 2007-2008
project subject :
Arsbaran irrigation and drainage network plan – construction of buildings and purchase, installation and commissioning of electromechanical equipment – first part
Geographical location of the project:
East Azerbaijan – Kalibar
main contractor:
Rahsara Co
Implementation activities of the plan:
– Construction and installation of power and control panels for 7 pumping stations for 64 high pressure electropumps
– Installation and operation of 64 electric pumps of pumping stations
– Installation and commissioning of 21 electric actuators
– Installation of precision instrument equipment in 7 parts of the pump house
– Installation and operation of 14 nailing systems
– Installation and commissioning of 103 local control panels of electric pumps
-Installation and operation of 20 kV panels in 7 stations
project schedule:
Years of project implementation: 2007-2008
project subject:
Pumping station from the main Moghan canal
Geographical location of the project:
Ardabil – Moghan
main contractor:
Rahsara Co
Implementation activities of the plan:
– Construction and installation of power and control panels for 6 one and a half megawatt pumps
– Installation and operation of 1 ultra sonic flowmeter
– Installation and operation of 8 electric actuators
– Installation of precision instruments in the pump house
– Installation and operation of PLC system and control system – Installation and operation of 6 local control panels of electric pumps
– Installation and commissioning of control and monitoring equipment of the central control room
– Construction, transport and installation of signs and station telemetry system with regulatory tank
project schedule:
Years of project implementation: 2016-2018
project subject :
Electrical and control equipment and precision instruments of the secondary pumping stations of the first construction unit of Khoda Afarin
Geographical location of the project:
East Azerbaijan and Ardabil
main contractor:
Rahsara Co
Implementation activities of the plan:
– Construction and installation of power and control panels for 12 pumping stations
– Installation and commissioning of 36 electromagnetic flowmeters
– Installation and commissioning of 103 electric actuators
– Installation of precision instruments for pump houses
– Installation and operation of PLC system and control system of 12 chapters of pump houses
– Installation and operation of 103 local control panels of electric pumps
– Installation and commissioning of the control and monitoring equipment of the control room of 9 pumping stations
project schedule:
Years of project implementation: 2018-2019